Page History
...
- NIRISS testing is being done using awesimsoss NIRISS/SOSS simulations of K2-141 (which has a short transit duration, hence the selection). Care must be taken as this is the first end-to-end simulation of awesimsoss (which is under active development). In-progress notebooks of each stage testing can be found here.
- MIRI testing is being done using MIRISim simulations of MIRI/LRS.
- NIRCam testing is being done using Mirage simulations of imaging and grism time series (350 frames of 5 groups, i.e. 70 exposures) of a modified version (deeper transit) of WASP-79b. Notebooks for the testing are available here.
- NIRSpec testing is being done on CV3 data.
...
Pipeline step | NIRISS status | NIRISS comments | NIRCam status | NIRCam comments | MIRI status | MIRI comments | NIRSpec status | NIRSpec comments | ||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
assign_wcs |
| Assign WCS indeed adds information to the ASDF name of the files. Tested that ranges of the WCS information made sense. |
| DoneRuns without a crash and assigns WCS correctly. |
| done |
| |||||||||||||||||||||||||||||||||
extract_2d |
| This step is not supported for NIRISS/SOSS, and indeed running this steps shows the "not-supported" message. Still, saves an output equal to the input. |
| DoneRuns without a crash and extracts 2d spectra. |
| n/a |
| |||||||||||||||||||||||||||||||||
flat_field |
| Flat field is correctly applied to NIRISS/SOSS data. |
| DoneRuns without a crash and performs flat field correction. |
|
Build 7.5: Failed current validation test | ||||||||||||||||||||||||||||||||||
srctype |
| As stated in the documentation, TSO always defines SRCTYPE to POINT. The pipeline indeed does this for NIRISS/SOSS TSO data. |
|
|
Build 7.5: Logic is not correct, always defaults to POINT, even when provided EXTENDED | |||||||||||||||||||||||||||||||||||
photom |
| Photometric calibration is performed according to the NIRISS reference files. |
|
|
| |||||||||||||||||||||||||||||||||||
extract_1d |
| This step currently extracts a big chunk of the whole subarray as a spectrum, which produced order overlap, which makes this step produce an unusable product for science right now. An algorithm is in development for this step. For details, see
|
|
|
Build 7.5: methodology needs to be vetted by TSOWG | additional comments pending |
...