Date

Slides & Recording

Attendees

Agenda 

  • News & Announcements
  • TSO upcoming observations + TTRB highlights
  • Topic 1
  • Topic 2
  • Closing remarks

Discussion items

TimeItemWhoNotes
2 minNews & AnnouncementsAll
8 min  TSO upcoming observations + TTRB highlightsSlash

Unable to pull scheduled observations due to issue with TSO monitor.


PID 7068 - Target skipped - approved. 

PID 7073 - Another test for positioning source outside the FOV - approved.

10 minRound Table Check InAll

NIRSpec - Munazza

  • Charge migration TR is ready to be submitted for review within team
  • Starting writing up systematic slopes
  • Ongoing work on timestamp differences by Alicia Lloyd (intern) - update in a couple of weeks!
  • Considering implementing multistripe for NIRSpec
    • Unlikely to be ready for Cycle 6 disappointed face 

NIRISS - Aarynn

  • There's studies for the spectral profile for SOSS ongoing — want to refine this model.
    • Going through building all the resources how people are doing this.
    • Will pick the best way forward using that for both full frame and subarray.
    • Aim is to finish this around ~February
  • The other work is 1/f for SOSS
    • Tricks used for other instruments just don't work because all pixels are illuminated.
    • Taking a look at this now.
    • Trying the current steps with all settings that can be thought of to showcase need something more involved to improve data quality
    • Hopefully make this happen next year.
  • Prepping SOSS MULTISTRIPE for commissioning
    • Won't be doing it until ~June
    • But hopefully if able to do a quick turnaround on this could have it ready for within Cycle 5.
    • Significant number of props on this mode for Cycle 5.
  • There's an update for SOSS Order 3
    • Update to PASTASOSS now to get a quick fix to be able to support Order 3 on the pipeline
    • Nestor Espinoza suggests to reach out to Jens Hoeijmakers who has a calibration program for Order 3

NIRCam - Brian/Achrene

  • DHS
    • Issue with ASIC microcode not providing sufficient time to provide commands to the detector
    • Arizona duplicated this in the lab and produced a configuration fix!
    • Issue only for NIRCam
    • Plan to get an on-sky test in early spring/summer. 
    • Next month the ASIC team will meet to get things going on the operations side. 
  • DHS Calibration
    • Calibration will happen in March, commissioning in May/June.
      • So same thing as last year but with a one year delay.
    • Wavelength and flux calibration
      • Pushing for TSO of WASP-18 in June too, plan may change with commissioning
    • Will contact PI's of DHS programs about the plan.

MIRI - Hannah/Taylor

  • New MIRI Subarrays
    • Somewhere on the ETC team, some questions as to what readout modes should be available. 
    • Aim is to make this available prior to Cycle 6, people could ask to switch their Cycle 4/5 proposals too. 
  • MIRI Multistripe
    • Not too relevant to TSO
      • Primarily for MIRI MRS
      • Aarynn: Why not LRS
        • Taylor: Just not being considered at the moment
      • Hannah:
        • Based on how well imaging works, could consider this for LRS
        • Need to work on the science case
  • Taylor working on a technical report for brighter fatter calibration
    • Long timescale, but goal is to have things ready by June
10 min

DHS Updates

Dyrek/Stansberry

Covered in the NIRCam update

  • Néstor: Is there still an issue with the code not accounting for the length of the cable?
    • NIRISS/NIRSpec/FGS allows direct communication between ASIC and detector, NIRCam doesn't
    • Has to take a longer path, and wasn't given enough time to reach the detector.
    • Solution is to allocate more time. 
  • Loïc: Why does NIRCam not have a direct connection
    • Question for Everett - he has moved to Schmidt Sciences
  • Aarynn: Why couldn't Goddard test this?
    • Didn't have temperature control or fidelity of the copy of the system
    • Also an issue of urgency, and available personnel
5 minClosing remarks All 

Action items

  •